Custom Blind Solutions Australia Wide | Trusted by Homeowners and Professionals since 2015

← All Case Studies

Queen Victoria Building IPOH

7 October 2025

As part of an enquiry by IPOH, ENSOL Systems where asked to review a heat load issue IPOH Engineering office was having with their ceiling atrium.

Temperatures had been recorded at 40 degrees plus on the frame work and because of the orientation that heat load was reaching engineers at their desks 3 meters below.

Results

ENSOL Systems engaged Energy Neutral Solutions to install Ultrasol. Since its installations, IPOH engineers have remarked how significantly cooler it is in the offices and how much the glare has reduced and they haven’t lost their view of the Sydney skyline.

The area is now being used continuously by staff.